You are: home > anderton concrete news

INFRARAIL 2014 (3.7.2014)

Anderton Concrete took the opportunity to officially launch four new products at Infrarail 2014. The Anderton stand was strategically positioned within the Rail Alliance Hub which provided ideal exposure for new product launch.

Anderton Sales Director Shaun Forrester commented “Infrarail 2014 was an excellent opportunity to showcase our new rail innovations as well as an ideal platform to display our precast retaining wall products”.

Anderton visited the Earls Court event to launch Anderlite, Anderlite 500, Ander-Clip and Ander-Fin. Anderlite is a revolutionary lightweight cementitious cable route system which not only reduces the weight of traditional methods of containment but uses up to 35% of recycled material. A further development and natural progression is the Anderlite 500 which further reduces the weight of traditional methods by offering all straight C/1 trough and lids in 500mm lengths. Both Anderlite and Anderlite 500 have full Network Rail approval.

To further compliment the Anderton troughing range Infrarail witnessed the launch of two pioneering Cable Theft Deterrents, Ander-Clip and Ander-Fin. Ander-Clip is designed to prevent the unauthorised removal of trough lids by securing each lid to each trough by use of 2 trough clips and a lid bracket ‘Simple but Effective’.

Ander-Fin utilises a pre-formed slot in the base of troughing unit, from which cable ties/clips can be attached to the fin and secured at regular intervals within the cable route. This makes quick removal of large lengths of cable virtually impossible.

Ander-Clip and Ander-Fin are patented designs.

More Info

Back to list >
Slope-Loc supplied to Barratt Homes - 22.4.2013
CPR and CE Marking (25.6.2013)
Anderton Platform Copings supplied for North West Stations
Hockley Station Platform Repair Work (5.9.2013)
Anderton supports a variety of charities (8.10.2013)
Anderton Presents at Geotex (9.10.2013)
New Product Range: Anderlite Troughing System (14.11.2013)
Anderton achieve ISO 14001:2004 certification
CPD seminars available - Book your's today! (5.3.2014)
Ridgeons Meet the Merchant event
Anderton attend NMBS 2014 Exhibition (11.4.2014)
new products we'll be showcasing (9.5.2014
See us at Geotex in Belfast next week (9.5.2014)
Exciting new product launch - Anderlite 500 (14.5.2014)
RAIL LIVE 2014 (3.7.2014)
Keystone BBA Certificate updated (23.7.2014)
Final A380 Structure to commence (21.11.2014)
Slopeloc at Barratts Homes, Wyke
Railtex 2015
Slopeloc at Barratts Homes, Wyke
Tinsley Bus Rapid Transit Link
Anderfin Approval
Stepoc Reaching Further afield
New ASM Vacancy
Boys & Boden - Chester
UK Sepsis Trust
Rail Live 2016
InfraRail 2016
Jewson Helps to Spread the Word
Lighthouse Charity Sponsorship
New Ibstock Brick Factory
Anderton Branded Lorries
BIM Objects Available
DIY SOS The Big Build
Alzheimer's Memory Walk
Anderfin on Crossrail
Supporting the Local Community
Scorpion Clip
Running for England
Keystone International Workshop
Walkway Trough
Keystone at Whitebank Stadium
3 Peaks Challenge 2018
London Nightrider Event
Manchester Spine Road
Charlie Luxton Builds a House
Health and safety remains key for Anderton during the European Week for Safety and Health at Work