Retaining Wall System Case Studies

Ivydale Primary School, London SE15 - Stepoc Shuttering Block System

Client: London Borough of Southwark

Architect: Hawkins Brown, london

Structural Engineers: Elliott Wood, London

Main Contractor: Galliford Try

Sub-Contract Groundworks: Modebest Builders Ltd

Increasing demand for primary school places is a national issue. In 2014 the London Borough of Southwark (LBS) proposed an increase to the  Reception Year intake from 60 pupils to 120 pupils from 2016 onwards. It further proposed an additional new school site, located in Inverton Road to allow the school to cater for an expanded pupil roll. The client's brief required a high security boundary solution between and existing secure unit and  the new build primary school. After much technical investigation it was decided that the optimum solution in terms of meeting the client's design brief, budget  and programme requirements was to construct a Stepoc wall.

 

Wodehouse Hotel during construction

 

The wall was constructed using approximately 400m² of the 256mm wide Stepoc blocks and reached a height of almost 5m. Unlike the majority of Stepoc walls there was no finish applied to it after completion apart from several coats of Masonry Paint. The Sub-contractor, Modebest had achieved an excellent finish on the wall which enabled this fairface finish.

Stepoc wall at Ivydale School

 

Case Studies

Glasshoughton Railway Station

East London Line Project

Ryton Park Primary School

Waterloo Mount

Chelmer Village

Littleborough Station

University of St Mark & St John

Sondes Place

Wodehouse Hotel

Manchester Airport Spine Road

Ivydale Primary School

Back to 'Case Study List' 

 

Contact us

Anderton Concrete Products Limited
Units 1 & 2
Cosgrove Business Park
Soot Hill
Anderton
Northwich
Cheshire 
CW9 6AA

Rail, Fencing & Building 
T: 01606 79436
E: sales@andertonconcrete.co.uk

Civil Products & Sales 
T: 01606 535300
E: civils@andertonconcrete.co.uk